Newcastle-under-Lyme · ST5 · Staffordshire
Roof Cleaning in Newcastle-under-Lyme
Looking for roof cleaning in Newcastle-under-Lyme? We clean roofs across Staffordshire, with a free survey and a fixed written quote before any work starts.
Guide price in Newcastle-under-Lyme: £380–£660 typical 3-bed semi

Roof conditions in Newcastle-under-Lyme
In Newcastle-under-Lyme we see inter-war semis in Marley and Redland concrete tile, Victorian terraces in Welsh slate and Staffordshire blue clay. The local climate brings steady rainfall and plenty of mature trees across the suburbs, so north-facing pitches usually carry the heaviest moss.
Signs your roof needs attention
- Gutters overflowing with moss after rain
- Yellow or white lichen spots on the tiles
- Black streaks running down the pitch
Included in your Newcastle-under-Lyme quote
- Photo report of any cracked or slipped tiles
- Low-pressure rinse matched to the tile type
- Ground sheeted and debris bagged and taken away
- Driveway and paths rinsed down afterwards
- Written guarantee on workmanship
Tell us about your roof and we'll come back with a survey date that suits you.
Request a survey in Newcastle-under-Lyme
We'll arrange a free survey at a time that suits you and confirm a fixed price for your ST5 property.
Nearby
Also in Newcastle-under-Lyme
Questions from Newcastle-under-Lyme customers
Do I need scaffolding?
Many roofs can be reached safely with roof ladders and edge protection. Taller or steeper roofs may need a scaffold, which we'll include in the quote if needed.
Can you work if it rains?
Light drizzle is fine for moss removal, but biocides need a few dry hours, so we rearrange in heavy rain or frost.
How soon can you start in Newcastle-under-Lyme?
Surveys in Staffordshire are usually booked within a week, and most jobs are scheduled within two to three weeks, weather permitting.
Will roof cleaning damage my tiles?
Not when it's done properly. We take moss off by hand and rinse at low pressure, which is far gentler than a high-pressure jet. We report any tiles that were already cracked before we start.
